Professional Electrical Load Study Services
Make informed decisions about your electrical infrastructure with comprehensive load studies. Essential for EV charger installations, equipment additions, and capacity planning. We deliver professional documentation suitable for engineering review, permit applications, and utility coordination throughout California.
EV Charging Planning
Determine available capacity for Level 2 or DC fast chargers. We provide load management strategies, utility coordination support, and documentation for permits and grants.
Professional Data Analysis
7-30 day monitoring with professional-grade equipment. Comprehensive measurements of voltage, current, power factor, harmonics, and peak demand with detailed engineering reports.
Engineering Documentation
Stamped reports available, detailed load calculations, panel schedules, single-line diagrams, and complete documentation for permits, utilities, and grant applications.
Capacity & Code Compliance
Verify available capacity for new equipment, ensure NEC compliance, identify safety issues, and provide actionable recommendations for system optimization and upgrades.
| Study Type | Duration | Deliverables |
|---|---|---|
| Panel Load Study | 7-14 days | Capacity report, recommendations |
| EV Charging Study | 14-21 days | Load analysis, utility coordination |
| Service Entrance | 21-30 days | Full facility analysis, upgrade plan |
| Power Quality | 7-30 days | Harmonic analysis, solutions |
Critical Data for Critical Decisions
Comprehensive Load Study Services
Ready to Get Started?
Contact us today for a consultation!
Contact Us