Commercial EV Charger Installation Los Angeles
Commercial EV charging projects need more than a charger on a wall. Shaffer Construction plans, permits, and installs Level 2 and DC fast charging systems for Los Angeles fleets, multifamily properties, retail centers, workplaces, warehouses, and commercial parking facilities. We start with the electrical load study, coordinate the permit path, install the charging infrastructure, and support the site after commissioning.
Commercial EV Charging Built Around Your Electrical Capacity
Level 2 Chargers for Workplaces and Multifamily Properties
Reliable daily charging for tenants, employees, customers, and light duty fleets
DC Fast Charging for Fleets and High Traffic Sites
Higher power charging for routes, turnover, and commercial uptime
Permits, Load Studies, Installation, and Commissioning
One electrical contractor from feasibility through final inspection
| Type of Charger | Power Rating | Charging Speed |
|---|---|---|
| Level 2 Chargers | 3.3 to 19.2 kW | Employee, tenant, customer, and overnight fleet charging |
| DC Fast Chargers | 25 to 350 kW+ | Fleet turnaround, public charging, retail, and high traffic sites |
Commercial EV Charger Installation for Los Angeles Properties
Commercial EV Planning Guides
Planning budget, permits, load capacity, or charger selection before you call? Start with our commercial EV charger installation cost guide, then review the Los Angeles EV charger planning guide, the electrical load study cost guide, and when a property needs a load study.
These guides help owners decide whether the next step is a site walk, monitoring, load management, a panel upgrade, utility coordination, or a construction estimate. If you already have a site address, charger count, photos of the main electrical gear, charger cutsheets, or a parking layout, send those details so we can price the right scope.
Ready to Get Started?
Contact us today for a consultation!
Contact Us