California EV Charger Reliability Study: Lessons for LA

Introduction
Every owner who is thinking about adding EV chargers eventually asks the same question: will they actually work when a driver shows up? California now has a more careful answer than it did a month ago. The California Energy Commission (CEC) released a staff report titled Results of Field Tests of California's Electric Vehicle Charging Network, dated November 2026, and its publication page shows an update on November 16. The agency calls its dataset the largest of its kind that it has assembled, and the findings are more encouraging than many drivers expect.
At Shaffer Construction, we plan and install commercial EV charging infrastructure across Los Angeles. This article is not about a project we built. The CEC study covers the whole state, not Los Angeles alone, and we were not involved in it. What follows is our own reading of the report for Los Angeles property owners, and we will say clearly which parts come from the sources and which parts are our analysis.
What the California Energy Commission Measured
California law, Assembly Bill 2061, tells the CEC to assess charger uptime. The agency does not yet have the continuous data that requires, so it had UC Davis researchers test chargers in the field. According to the report, they plugged into 3,571 ports and observed 12,586 more between January 2024 and February 2026. The operational rate, meaning ports that worked when the tester arrived, was 96.2 percent for Level 2 and 96.4 percent for DC fast chargers. The successful charge attempt rate was 93.1 and 94.0 percent. Rural, urban, and low-income communities differed by about a point or less. The CEC stresses that this is a snapshot, not a year of uptime.
Why These Numbers Look Better Than Older Studies
Earlier research reported far lower figures, including a 72.5 percent success rate in one study the CEC cites. The agency argues those studies blended dead chargers, failed sessions, and design problems into one score, and it also warns that methods differ. That caution matters, because a 96 percent operational rate does not mean a charger works 96 percent of the year. In its Q3 2026 national fast charging report, published October 13, Paren's guest commentary puts industry fast charger reliability at just under 94 percent, and the report says new non-Tesla sites averaged 5.0 ports, up from 4.1 a year earlier. More ports per site means a driver has a spare when one fails.
The Biggest Problems Were Payments and Blocked Spaces
The most useful part of the CEC report for owners is the list of reasons attempts fail. Payment came first. Credit and debit cards failed on the first try 34.4 percent of the time, apps and QR codes 14.0 percent, and plug-in payment such as Plug and Charge just 2.3 percent, though the CEC says one closed network dominated that last result. Tap payments beat chip and swipe. Access was the second problem. Nearly 9 percent of Level 2 ports and 7 percent of fast ports were obstructed, by construction, dumpsters, and gasoline vehicles. The CEC calls these access issues rather than reliability issues, but a blocked stall is unusable either way. The largest networks also outperformed the rest, with a 99.6 percent operational rate on fast chargers against 92.1 percent for others.
What California Policy Adds to the Picture
The study arrives at a moment when California is changing the rules around chargers. The CEC's standards, adopted in October 2025, took effect April 1, 2026, and the agency expects the first required data submissions near the end of 2026. We covered the start of those rules earlier this year in our post on California's 97 percent uptime requirement. The CEC has also proposed amendments to those standards, and a public hearing on September 24 covered a proposal to exempt Megawatt Charging System chargers from certain requirements, which mainly concerns heavy truck charging.
The state is also trying to make chargers easier to build. In a September 20 announcement datelined Los Angeles, the governor's office said it signed six bills. Among them, SB 1283 clarifies that streamlined charger permitting also covers related work such as trenching, electrical upgrades, solar canopies, and battery storage. AB 1820 reduces permitting barriers and fees for charging at apartments and mixed-use developments, and SB 969 modernizes an inspection step that can delay public chargers from opening. The release also counts more than 216,445 public and shared charging plugs in California, including more than 20,000 DC fast ports.
Money is part of the picture too. In its August 18 announcement, the CEC said it approved a $95.2 million investment plan for the current fiscal year, including $48 million for light-duty charging with a focus on DC fast charging and at-home or near-home charging. Funding programs change quickly and carry their own eligibility rules, so check the current terms before you count on any of it.
What This Means for Los Angeles Property Owners
None of these sources says anything specific about a Los Angeles building, so the rest of this section is our analysis. The first lesson is that reliability is a design question, not just a hardware question. A charger that works in the lab can still fail in a parking structure with poor cellular service, a payment terminal with a weak network connection, or a breaker that trips because the circuit was sized too tightly. An experienced electrical load study before you buy equipment tells you how much capacity is truly available at the panel and the service, which keeps a charger from tripping a main breaker the first time the building is busy.
The second lesson is that the site matters as much as the charger. The CEC found that blocked stalls and hard-to-find stations were common enough to measure. In Los Angeles, where parking is tight and lots serve many purposes, that is a real planning issue. Locate the chargers where trash service, deliveries, and construction staging will not take over the stalls. Mark them clearly, post signs that explain who may park there, and make sure the address and location data that apps use to guide drivers are correct. The CEC specifically notes that better location information at the time of installation could help.
The third lesson concerns payment. If you operate public or customer-facing chargers, choose equipment with tap-to-pay readers and a stable connection, and ask your network provider how payment failures are monitored and fixed. Electrical contractors do not write payment software, but we do control the physical conditions around it, including power quality, conduit paths for network cable, and placement that gives a cellular modem a decent signal. Ask for a written answer on who is responsible when a reader fails, because the CEC study shows that this is where many failed sessions begin.
The fourth lesson is to plan for service, not just installation. Chargers are electrical equipment that will eventually need attention. Put disconnects and breakers where a technician can reach them, label circuits clearly, leave room to replace a unit without tearing up the surrounding concrete, and keep the as-built drawings. A site that is easy to service is a site that comes back online sooner. For a related look at how installation choices affect long-term cost, see our guide to the real cost of EV charging in Los Angeles.
Finally, remember that the state data describes public charging. If you manage an apartment building, an office, or a workplace, your drivers may charge at your property every day, so a reliable charger can matter more than the price of the equipment. The multifamily and permitting changes described above may make it easier to start, but a clear plan for capacity, parking, and maintenance still has to come first.
It also helps to ask a short list of questions before signing anything. Which company owns the chargers, and which one answers the phone when a driver reports a problem? How quickly will a failed unit be repaired, and who pays for the visit? Can you see the charger status data yourself? Because the CEC will now collect hourly data from publicly funded fast chargers, owners who apply for public funding should expect reliability reporting to become part of the job, and they should choose a contractor and a network provider that can support it.
What the Report Does Not Tell Us
It is worth being plain about the limits. The CEC's results are a statewide snapshot taken at the moment of each test, collected over about two years, and they are not a measurement of Los Angeles specifically. The report says the first official uptime assessment will come from the data that networks begin reporting after late 2026. The Paren figure comes from a guest commentary rather than from the CEC's method, so the two numbers should not be compared directly. And the plug-in payment result reflects a single network. We would treat the CEC findings as a hopeful signal and a checklist of problems to design around, not as a guarantee.
Conclusion
The CEC field study offers the best evidence yet that California's public chargers work more often than their reputation suggests, with operational rates around 96 percent and successful charge attempts around 93 to 94 percent. The same report shows where the remaining failures come from: payment systems, blocked spaces, uneven network quality, and hard-to-find stations. For a Los Angeles owner, almost every one of those problems can be reduced by planning the electrical capacity, the parking layout, the payment hardware, and the maintenance access before the first charger is ordered.