Commercial Electrical Code Compliance Corrections in Altadena

Professional Electrical Code Compliance Corrections services for Altadena homes and businesses. Expert electrical installation with fire-resistant design, modern safety features, and full code compliance.

Licensed & Insured
A, B & C10 Contractor
25+ Years
Experience in LA
1000+ Projects
Successfully Completed

Our Work

Tesla Supercharger station with solar canopy installation by Shaffer Construction electrical contractorsCommercial EV charging infrastructure with electrical panels and utility meters installed by licensed electriciansTesla Powerwall battery storage system professionally installed on residential home exterior

Benefits

Future-ready compliance and resilience

We pair deep code expertise with modern tools: digital circuit mapping, QR-coded panel schedules, thermal imaging, and load-monitoring to inform right-sized, resilient corrections. For lighting, we implement networked Title 24-compliant control systems (e.g., Lutron Vive, Leviton) optimized for natural light and energy efficiency, enabling occupancy/daylight strategies, scheduling, and remote diagnostics. Our designs scale for future EVSE circuits, backup generators, solar-plus-storage systems, or added tenant loads—protecting your investment, supporting business continuity during fire-season grid events, and keeping inspections smooth in Altadena’s unique foothill and fire-recovery environment.

Permits and standards

We handle Los Angeles County permitting end-to-end and build to the California Electrical Code (CEC), California Energy Code Title 24 Part 6 (lighting controls), and applicable sections of the California Building and Fire Codes. For VHFHSZ and fire-rebuild properties, we coordinate Cal Fire electrical provisions, fire-hardening documentation, and defensible-space compliance. We perform required Title 24 acceptance testing and align with Southern California Edison service requirements (including underground service installation where required). Documentation includes one-line diagrams, load calculations (CEC Article 220), equipment submittals, fire-hardening certifications, and as-built drawings.

Proven quality, safety, and fire resilience

Our crews follow NFPA 70E safe work practices and use UL-listed materials optimized for mountain weather and fire-risk environments: copper THHN/THWN-2 conductors, fire-rated and weather-resistant enclosures (NEMA 3R/4X, ignition-resistant where required), and corrosion-resistant fittings. We specify properly rated surge protective devices (UL 1449 Type 1/2), stainless or hot-dip galvanized hardware for outdoor and rooftop installations, liquidtight flexible conduit where needed, fire-rated boxes and covers where code requires, and labeled terminations per ANSI Z535. Every connection is torque-verified, conductors are neatly managed, and panels are clearly placarded for quick, accurate inspections and safer long-term maintenance in fire-prone and mountain-weather conditions.

Tailored planning and design

We begin with a code-focused assessment, photo-document all violations, and build a prioritized correction plan. Our team prepares one-line diagrams, Title 24 control sequences, fire-hardening plans (where applicable), and any panel/service upgrades required. We coordinate work windows around business hours (especially critical for restaurants, retail, and professional offices), protect customer areas, and phase corrections to minimize downtime. For properties in VHFHSZ areas, undergoing fire rebuilds, or requiring fire-marshal approvals, we integrate fire-hardening, defensible-space compliance, and backup-power planning into the design.

What We Offer

Comprehensive code violation audits with photo documentation and prioritized correction plans for fire-zone and fire-rebuild properties
Load calculations and one-line diagrams per CEC Article 220 for tenant improvements, service changes, and future expansion (EVSE, solar, backup power)
Panel and gear corrections: replacement of obsolete panels (Zinsco, FPE, Pushmatic), SCCR labeling, AIC verification, fire-rated enclosures where required, and clear working-space compliance
Grounding and bonding upgrades with fire-rated and corrosion-resistant materials: water pipe bonding, building steel bonding, supplemental electrodes, gas pipe bonding where required, and isolated grounds for sensitive equipment
GFCI protection additions for kitchens, bathrooms, rooftops, exterior outlets, and service receptacles; AFCI where required by occupancy
Title 24 lighting control retrofits: occupancy/vacancy sensing, multi-level dimming, daylighting zones with photocell control, timeclock scheduling, and demand response where applicable
Emergency egress lighting and exit sign corrections with UL 924-compliant equipment, battery backup testing, and fire-rated housings where required
Rooftop HVAC electrical corrections: lockable disconnects, GFCI service receptacles within required distance, weather/fire-resistant fittings, and proper clearances
Surge protection (UL 1449 Type 1/2 SPDs) at service and critical subpanels for POS systems, servers, kitchen equipment, and data/telecom rooms
Circuit reorganization and panel schedule labeling with QR-coded directories, CAD as-builts, and clear documentation
Signage and exterior lighting circuits: dedicated breakers, photocell/time control, weatherproof disconnects, and fire-rated enclosures where required
Kitchen and restaurant electrical corrections: dedicated appliance circuits, grease-hood fire-suppression interlocks, GFCI protection, and weather/fire-rated enclosures

Frequently Asked Questions

Do I need a permit in Altadena for electrical corrections in an existing commercial space?+

Most commercial electrical corrections require a permit through Los Angeles County Department of Public Works, Building and Safety Division, especially for panel work, new circuits, and lighting control retrofits. Minor device replacements may not need permits, but Title 24 lighting changes generally do. For Very High Fire Hazard Severity Zone or fire-rebuild properties, additional fire-hardening and defensible-space approvals are required. We’ll confirm scope, advise on all permit requirements, and file on your behalf.

How long will code corrections take and can you work after hours?+

Corrections typically take 1–5 days on-site, depending on the number and complexity of violations and fire-hardening requirements. We frequently schedule after-hours or overnight work for retail, restaurants, and active offices to avoid disrupting business. Phased plans address life-safety issues first, then efficiency and optimization items. Permit timelines with Los Angeles County range from 1–3 weeks for routine work to 4–8 weeks for fire-zone or fire-rebuild approvals.

What are common Title 24 lighting control issues you fix in Altadena commercial spaces?+

We regularly correct missing occupancy sensors, non-compliant multi-level dimming, lack of daylighting control in perimeter zones, and improper schedules or overrides. We design, install, program, and commission sequences of operation, complete acceptance testing with certified technicians, and submit documentation for final Los Angeles County inspection.

I’m rebuilding my business after the Eaton Fire. What electrical code and fire-hardening requirements apply?+

Fire-rebuild commercial properties in Altadena’s Very High Fire Hazard Severity Zones must meet Cal Fire electrical provisions: ignition-resistant materials and enclosures where required, defensible-space clearances for service equipment and exterior wiring, underground service routing in many cases (coordinated with SCE), and integration with fire-resistive building assemblies. You’ll also need full compliance with CEC, Title 24 Energy Code, and Los Angeles County commercial requirements. We manage fire-hardening plans, permitting, material selections, utility coordination, fire-marshal reviews, and inspections to ensure your rebuild passes and supports long-term business resilience.

Ready to Get Started?

Contact us today for a free consultation and quote on your electrical project!

Contact Us