Commercial Electrical Panel Upgrades in Atwater Village

Powering busy storefronts on Glendale Boulevard and creative spaces near Casitas Avenue takes more than a few extra breakers. Shaffer Construction, Inc. delivers code-compliant commercial electrical panel upgrades tailored to Atwater Village's restaurants, retail, studios, and light industrial suites along the LA River. We assess your current service, design the right-capacity main panel, coordinate with LADWP, and complete the cutover with minimal downtime—often in one to two days. Expect clear timelines, precise workmanship, and clean job sites so your team can get back to serving guests and clients quickly.

Licensed & Insured
A, B & C10 Contractor
25+ Years
Experience in LA
1000+ Projects
Successfully Completed

Our Work

Tesla Supercharger station with solar canopy installation by Shaffer Construction electrical contractorsCommercial EV charging infrastructure with electrical panels and utility meters installed by licensed electriciansTesla Powerwall battery storage system professionally installed on residential home exterior

Benefits

Future-Proof Your Business

We engineer upgrades with future growth in mind—designing for 200–400A main services (and higher where needed), spare breaker spaces, and scalable subpanels. We standardize on 120/208V three-phase for most small commercial, and plan feeders for potential EV chargers, rooftop HVAC, POS expansions, and kitchen upgrades. Smart metering, surge protection, and power-quality monitoring help spot issues early and support energy projects down the road.

Expert Permit & Code Compliance

Shaffer Construction manages the entire permitting process with LADBS, prepares single-line diagrams and load calculations (NEC Article 220), and submits for plan check when required. We coordinate LADWP shutdowns and meter upgrades, and label equipment per NFPA 70/70E. Our installations follow the Los Angeles Electrical Code (LAMC Ch. IX) and California Title 24, with UL-listed gear and clear working spaces per NEC 110.26.

Unmatched Craftsmanship & Materials

We install high-quality panels with copper bus bars, bolt-on breakers, and robust meter bases from trusted brands. Conductors are THHN/THWN-2 copper, color-coded, and torqued to specification with documented torque logs. We use proper bonding jumpers, Ufer/supplemental grounding electrodes, and NEMA-rated enclosures. Before sign-off, we verify labeling, perform thermal scans under load, and tighten terminations to ensure long-term reliability and safety.

Custom Assessment & Design

Every upgrade starts with a detailed site assessment, a utility-side review, and data-backed load calculations. We map critical circuits, verify equipment nameplate ratings, and plan a cutover schedule that minimizes downtime. For multi-tenant properties, we design balanced phases and meter stacking. You’ll receive clear drawings, a material list, and a step-by-step schedule so owners, managers, and tenants know exactly what to expect.

What We Offer

200–400A main panel and meter base replacements
Multi-tenant meter bank upgrades and reconfiguration
Three-phase conversions and high-leg delta corrections
Load calculations and single-line diagram preparation
Grounding and bonding: Ufer, rods, water/gas bonds
Service mast relocation and weatherhead upgrades
Surge protection devices and power-quality monitoring
CT cabinet installs and LADWP service coordination
NEMA 3R/4 enclosures for outdoor panel locations
Circuit labeling, panel schedules, and arc-flash labels

Frequently Asked Questions

How long will my Atwater Village business be without power during the panel upgrade?+

Most cutovers take 4–8 hours, scheduled during early morning, late evening, or a planned dark day to protect operations. We stage materials in advance, coordinate with LADWP for the shutdown, and pre-assemble gear to minimize downtime. Complex multi-meter or service relocations may require a second short outage, which we plan and communicate in advance.

Do I need a permit for a like-for-like commercial panel swap in Los Angeles?+

Yes. LADBS requires permits for service equipment replacements, even like-for-like. Depending on scope, plan check may apply, especially for service relocations, meter banks, or larger ampacities. We handle permit submittal, drawings, and inspections, then work with LADWP for the release to energize so you stay compliant throughout.

Can you upgrade my meter bank serving multiple retail suites on Glendale Boulevard?+

Absolutely. We assess tenant loads, balance phases, and design a meter stack or bank with spare capacity. We coordinate cutovers suite by suite or during a single scheduled outage. We also update labeling and panel schedules, and verify grounding/bonding to meet LADBS and LADWP requirements for multi-tenant properties.

What if my building has an older high-leg delta or 120/240V service?+

We evaluate equipment compatibility, then design a safe path to 120/208V three-phase where appropriate. That may involve new transformers, service upgrades, and panel replacements. We’ll explain options, costs, and downtime, and coordinate with LADWP for any service-side changes so your future equipment selections are simpler and safer.

Ready to Get Started?

Contact us today for a free consultation and quote on your electrical project!

Contact Us