Commercial Pool, Hot Tub & Spa Electrical in Atwater Village
If you manage an apartment community off Glendale Boulevard, a boutique gym near the Hyperion Bridge, or a wellness spa steps from the LA River path, your pool and spa equipment must run safely, efficiently, and to code. Shaffer Construction, Inc. designs and installs commercial-grade electrical systems for pools, hot tubs, and spas tailored to Atwater Village properties. We handle dedicated circuits, GFCI protection, bonding grids, lighting, automation, and emergency shutoffs that meet California and Los Angeles requirements. Our local team understands the unique mix of older buildings and modern amenities in Atwater Village and delivers clean, reliable power that keeps guests happy and lowers operating costs.
Our Work



Benefits
Future-Ready Electrical Solutions
We design pool and spa electrical with growth in mind—automation-ready panels, variable-speed pump controls, low-voltage LED lighting, and surge-protected equipment pads. Our team integrates Pentair, Hayward, and Jandy controllers, timeclocks, and sensors for precise scheduling and remote access. We use THWN-2 copper conductors sized for anticipated expansions, and install NEMA 3R/4X enclosures and Schedule 80 PVC where exposure is severe. The result: safe, efficient systems that can scale as your amenities evolve.
Licensed & Code-Compliant Installations
Shaffer Construction manages LADBS permitting, plan set preparation, and inspection scheduling from start to finish. We build to California Electrical Code (CEC/NEC 680), Title 24 lighting controls, and Title 20 pump efficiency requirements. Commercial spas get emergency shutoff switches per CEC 680.41, GFCI protection per 680.22, and equipotential bonding per 680.26. We document conductor sizing, fault currents, and grounding/bonding continuity so inspectors and insurers have a complete record.
Proven Quality and Reliability
We use premium components: copper THWN-2 conductors, insulated bonding clamps, #8 solid copper bonding conductors, weatherproof disconnects, and UV-stable conduit and fittings. Terminations are torqued to manufacturer specs and labeled. All penetrations are sealed against moisture intrusion. We balance circuits to reduce voltage drop, add whole-system surge protection, and test GFCIs and emergency stops under load. Our installations are neat, accessible, and designed for easy maintenance and long service life.
Bespoke Planning & Design
Each project begins with a site survey: panel capacity checks, load calculations, fault current analysis, and verification of clearances around water. We map conduit routes to avoid roots and hardscape, detail bonding points for rails, ladders, and reinforcing steel, and select locations for transformers and automation panels outside prohibited zones. You receive a concise design package—scope, materials, one-line diagram, and schedule—tailored to your property’s layout and business needs.
What We Offer
Frequently Asked Questions
Do I need a permit for commercial pool or spa electrical work in Atwater Village?+
Yes. LADBS requires permits and inspections for new circuits, bonding grids, lighting, automation panels, and emergency shutoffs. Commercial projects typically undergo plan check. We prepare drawings, submit via ePlanLA, coordinate revisions, and schedule rough/final inspections so your system is approved and documented for insurance and occupancy.
How long will installation take and can you limit downtime for residents?+
Most installations take 1–3 days after permit approval. We stage materials, pre-fabricate conduit runs, and schedule work to minimize closure time—often completing noisy or water-adjacent tasks in off-hours. We’ll coordinate with on-site staff to keep access clear and provide advance notices to residents or members.
Our building has an older panel—can it handle a heat pump and new pump motors?+
We perform load calculations to confirm capacity. Many pre-1950s buildings have undersized services or outdated grounding. If needed, we’ll add a dedicated subpanel near the equipment pad or upgrade service to safely support heat pumps, variable-speed pumps, and controllers. Proper conductor sizing prevents nuisance trips and overheating.
What is an equipotential bonding grid, and why is it required?+
An equipotential bonding grid ties together conductive parts around the pool/spa—rebar, rails, ladders, and metallic fittings—using #8 solid copper. This minimizes voltage differences that can cause shock hazards. CEC 680.26 mandates bonding for commercial pools and spas; inspectors verify continuity at final inspection to ensure guest safety.
Are emergency shutoff switches required for commercial spas and hot tubs?+
Yes. CEC 680.41 requires an emergency shutoff (E-stop) for spas and hot tubs in public/commercial use. The switch must be within sight and typically 5–10 feet from the water’s edge, clearly labeled, and readily accessible. We install and test E-stops, then train staff on operation during turnover.
Related Services in Atwater Village
Ready to Get Started?
Contact us today for a free consultation and quote on your electrical project!
Contact Us