Commercial Pool, Hot Tub & Spa Electrical in Atwater Village

If you manage an apartment community off Glendale Boulevard, a boutique gym near the Hyperion Bridge, or a wellness spa steps from the LA River path, your pool and spa equipment must run safely, efficiently, and to code. Shaffer Construction, Inc. designs and installs commercial-grade electrical systems for pools, hot tubs, and spas tailored to Atwater Village properties. We handle dedicated circuits, GFCI protection, bonding grids, lighting, automation, and emergency shutoffs that meet California and Los Angeles requirements. Our local team understands the unique mix of older buildings and modern amenities in Atwater Village and delivers clean, reliable power that keeps guests happy and lowers operating costs.

Licensed & Insured
A, B & C10 Contractor
25+ Years
Experience in LA
1000+ Projects
Successfully Completed

Our Work

Tesla Supercharger station with solar canopy installation by Shaffer Construction electrical contractorsCommercial EV charging infrastructure with electrical panels and utility meters installed by licensed electriciansTesla Powerwall battery storage system professionally installed on residential home exterior

Benefits

Future-Ready Electrical Solutions

We design pool and spa electrical with growth in mind—automation-ready panels, variable-speed pump controls, low-voltage LED lighting, and surge-protected equipment pads. Our team integrates Pentair, Hayward, and Jandy controllers, timeclocks, and sensors for precise scheduling and remote access. We use THWN-2 copper conductors sized for anticipated expansions, and install NEMA 3R/4X enclosures and Schedule 80 PVC where exposure is severe. The result: safe, efficient systems that can scale as your amenities evolve.

Licensed & Code-Compliant Installations

Shaffer Construction manages LADBS permitting, plan set preparation, and inspection scheduling from start to finish. We build to California Electrical Code (CEC/NEC 680), Title 24 lighting controls, and Title 20 pump efficiency requirements. Commercial spas get emergency shutoff switches per CEC 680.41, GFCI protection per 680.22, and equipotential bonding per 680.26. We document conductor sizing, fault currents, and grounding/bonding continuity so inspectors and insurers have a complete record.

Proven Quality and Reliability

We use premium components: copper THWN-2 conductors, insulated bonding clamps, #8 solid copper bonding conductors, weatherproof disconnects, and UV-stable conduit and fittings. Terminations are torqued to manufacturer specs and labeled. All penetrations are sealed against moisture intrusion. We balance circuits to reduce voltage drop, add whole-system surge protection, and test GFCIs and emergency stops under load. Our installations are neat, accessible, and designed for easy maintenance and long service life.

Bespoke Planning & Design

Each project begins with a site survey: panel capacity checks, load calculations, fault current analysis, and verification of clearances around water. We map conduit routes to avoid roots and hardscape, detail bonding points for rails, ladders, and reinforcing steel, and select locations for transformers and automation panels outside prohibited zones. You receive a concise design package—scope, materials, one-line diagram, and schedule—tailored to your property’s layout and business needs.

What We Offer

Load calculations and panel capacity upgrades for pool/spa equipment
Dedicated GFCI-protected circuits for pumps, heaters, and sanitizers
Equipotential bonding grid installation with #8 solid copper
Bonding of metallic rails, ladders, handrails, and reinforcing steel
Weatherproof equipment disconnects (NEMA 3R/4X) and labeling
Automation panel integration (Pentair, Hayward, Jandy) and timers
Underwater and perimeter LED lighting with isolation transformers
Emergency shutoff (E-stop) installation for commercial spas (CEC 680.41)
Conduit trenching, backfill, and hardscape-safe routing with DigAlert 811
Surge protection for equipment pads and sensitive controllers
Subpanel additions near equipment pads for future expansion
Inspection corrections and as-built documentation for LADBS closeout
Grounding electrode system verification and upgrades
Preventive maintenance, testing, and seasonal tune-ups

Frequently Asked Questions

Do I need a permit for commercial pool or spa electrical work in Atwater Village?+

Yes. LADBS requires permits and inspections for new circuits, bonding grids, lighting, automation panels, and emergency shutoffs. Commercial projects typically undergo plan check. We prepare drawings, submit via ePlanLA, coordinate revisions, and schedule rough/final inspections so your system is approved and documented for insurance and occupancy.

How long will installation take and can you limit downtime for residents?+

Most installations take 1–3 days after permit approval. We stage materials, pre-fabricate conduit runs, and schedule work to minimize closure time—often completing noisy or water-adjacent tasks in off-hours. We’ll coordinate with on-site staff to keep access clear and provide advance notices to residents or members.

Our building has an older panel—can it handle a heat pump and new pump motors?+

We perform load calculations to confirm capacity. Many pre-1950s buildings have undersized services or outdated grounding. If needed, we’ll add a dedicated subpanel near the equipment pad or upgrade service to safely support heat pumps, variable-speed pumps, and controllers. Proper conductor sizing prevents nuisance trips and overheating.

What is an equipotential bonding grid, and why is it required?+

An equipotential bonding grid ties together conductive parts around the pool/spa—rebar, rails, ladders, and metallic fittings—using #8 solid copper. This minimizes voltage differences that can cause shock hazards. CEC 680.26 mandates bonding for commercial pools and spas; inspectors verify continuity at final inspection to ensure guest safety.

Are emergency shutoff switches required for commercial spas and hot tubs?+

Yes. CEC 680.41 requires an emergency shutoff (E-stop) for spas and hot tubs in public/commercial use. The switch must be within sight and typically 5–10 feet from the water’s edge, clearly labeled, and readily accessible. We install and test E-stops, then train staff on operation during turnover.

Ready to Get Started?

Contact us today for a free consultation and quote on your electrical project!

Contact Us