Commercial Pool, Hot Tub & Spa Electrical in Burbank

From hotel pools near the Hollywood Burbank Airport to apartment spas off Magnolia Boulevard, Shaffer Construction, Inc. delivers code-perfect, reliable electrical systems for commercial aquatic facilities in Burbank. We understand the uptime demands of hospitality and multifamily operators and the safety standards required for public pools. Our team designs, installs, and upgrades power, bonding, lighting, and controls that meet California Electrical Code Article 680 and pass inspection the first time. Whether you manage a boutique property by the Warner Bros. water tower or a larger complex near the Empire Center, we build durable, energy-efficient solutions that are easy to operate and maintain.

Licensed & Insured
A, B & C10 Contractor
25+ Years
Experience in LA
1000+ Projects
Successfully Completed

Our Work

Tesla Supercharger station with solar canopy installation by Shaffer Construction electrical contractorsCommercial EV charging infrastructure with electrical panels and utility meters installed by licensed electriciansTesla Powerwall battery storage system professionally installed on residential home exterior

Benefits

Advanced, Future-Ready Installations

We design control architectures that grow with your property: variable-speed pump controls, low-voltage automation (Pentair/Jandy/Hayward), BACnet gateways for BMS integration, and cloud-enabled monitoring of temperature, pump status, lighting, and GFCI health. We include whole-circuit surge protection, isolation transformers where needed, and structured conduit pathways for future adds—like heat pump water heaters or expanded deck lighting—so your system remains flexible and efficient as demands change.

Seamless Permits and Compliance

Shaffer Construction manages the full compliance pathway, from City of Burbank electrical permits to LA County Public Health coordination for public pools. Our plans follow California Electrical Code (CEC) Article 680, Title 24 exterior lighting controls (as applicable), and manufacturer instructions. We prepare as-builts, equipment schedules, and test logs, then meet inspectors on-site to expedite approvals and hand over a clean, well-documented project closeout.

Top-Tier Workmanship

We use premium materials suited for chlorinated and outdoor environments: THWN-2 copper conductors, Schedule 80 PVC in exposed areas, NEMA 4X or 3R weatherproof disconnects, 316 stainless hardware, and sealed fittings. Conductors are torqued to spec and labeled end-to-end. We megger-test critical runs, verify GFCI operation under load, and visually inspect for corrosion points to ensure your pool and spa systems perform for years with minimal maintenance.

Customized Design & Planning

Every project starts with a site walk to map equipment, deck, and egress lighting needs. We prepare one-line diagrams, load calculations per CEC Article 220, and short-circuit/AIC checks for the serving gear. Equipment locations are planned for service clearance and noise control per local ordinances. We model conduit routes, bonding paths, and emergency shutoffs, then review finishes and access with your team so the final layout fits your operation and aesthetic.

What We Offer

Equipotential bonding grid installation and remediation (NEC 680.26)
Dedicated circuits with GFCI breakers and proper conductor sizing
Weatherproof equipment disconnects and emergency shutoff stations
Pump, heater, and chemical controller power and interlocks
LED pool/spa lighting, low-glare deck and egress lighting
Automation panels (Pentair/Jandy/Hayward) and remote monitoring
Surge protection, grounding upgrades, and panel capacity reviews
Water bonding devices and metallic component bonding within 5 feet

Frequently Asked Questions

Do I need both City of Burbank and LA County approvals for my commercial pool?+

Yes. The City of Burbank Building and Safety Division issues electrical/building permits, while the Los Angeles County Department of Public Health oversees public pool health compliance. We coordinate both tracks, sequence bonding/rough/final inspections, and provide the documentation inspectors expect to keep your timeline on track.

How long will my pool or spa be offline during the upgrade?+

Most electrical scopes are completed in 1–3 days. We schedule outages in short windows, pre-fabricate runs off-site, and restore circulation between phases whenever possible. For hotels and busy multifamily properties, we can work early mornings or off-hours to minimize impact on guests and residents.

Our older property lacks a visible bonding grid—can you fix that without tearing up everything?+

Often yes. We can test bonding continuity, add a code-compliant equipotential bonding ring, bond metallic components within 5 feet, and install a water-bonding fitting. Where concrete work is planned (replastering or deck repairs), we coordinate to integrate bonding upgrades with minimal extra disruption.

Ready to Get Started?

Contact us today for a free consultation and quote on your electrical project!

Contact Us