Commercial Backup Generator Installation in Echo Park
Keep your Echo Park storefronts, studios, and venues powered through outages with a right-sized commercial standby generator. From the Sunset Boulevard retail corridor to creative spaces off Echo Park Avenue and Glendale Boulevard, we design and install systems that protect revenue, guests, and equipment. Our Los Angeles-based electricians handle everything: load studies, generator selection, fuel coordination, permits, acoustic control, and commissioning. With a deep understanding of Echo Park's historic character around Echo Park Lake and its dense, mixed-use lots, Shaffer Construction, Inc. navigates placement, noise rules, and tight utility rooms to deliver dependable, code-compliant power—without disrupting your tenants or neighbors.
Our Work



Benefits
Future-Ready Power Solutions
We design systems that scale as your business grows. From cloud-connected generator controllers with 4G/Ethernet monitoring to UL 1008-rated transfer switches with load-shed modules, your system adapts to changing loads. We implement closed-transition ATS where utility allows, staged motor starting, and power quality monitoring via Modbus/BACnet gateways. For multi-tenant buildings, we can parallel generators or add sub-ATS units to serve specific suites, maintaining flexibility as tenants change.
Permits and Local Compliance Experts
Shaffer Construction manages permitting and compliance end-to-end. We design to NEC Articles 700/701/702, apply NFPA 110 for emergency and standby systems, and specify UL 2200-listed generators and UL 1008 transfer equipment. We coordinate with LADBS, South Coast AQMD for stationary engines, and LAFD for diesel day-tanks. We also address LAMC noise limits with acoustic enclosures and barriers, and provide stamped structural calculations where rooftop placement or seismic anchorage is required.
Unmatched Workmanship and Reliability
We use premium materials: copper THHN/THWN-2 conductors, RMC or IMC for exterior/riser work, vibration-isolated concrete pads with seismic anchors per CBC/ACI, NEMA 3R/4 enclosures, and Type 1 surge protection at service and generator. Fuel systems are sized with code-compliant regulators, valves, and seismic strapping. We label and test every feeder, confirm neutral-grounding schemes, and verify fault-current ratings so the system performs safely—every time.
Custom-Tailored Generator Plans
Every Echo Park property is different. We start with a site walk to document existing panels, meter banks, rooftop access, and potential set locations behind storefronts or in alleys. We log loads, evaluate motor inrush, and consult with SoCalGas if a meter upgrade is needed. Our team coordinates any crane picks with LADOT if street space is required, integrates acoustic strategies for nearby residences, and finalizes a plan that meets business goals and neighborhood constraints.
What We Offer
We offer turnkey commercial generator services tailored to Echo Park’s dense, historic, and mixed-use properties. Common scopes include:
Frequently Asked Questions
Do I need a South Coast AQMD permit for a commercial generator in Echo Park?+
If you choose a diesel generator or a natural gas unit above certain horsepower thresholds, South Coast AQMD typically requires permits to construct and operate. We evaluate engine size and emissions controls early, prepare AQMD submittals when needed, and schedule inspections. Many smaller natural gas units may be exempt, but we verify case-by-case to avoid delays.
Can a generator be installed on my roof over a Sunset Boulevard storefront?+
Yes, rooftop installations are common on tight lots. We provide structural calculations, design vibration isolation to protect occupants below, and coordinate crane picks with LADOT if street space is needed. We also address acoustic treatment and sightlines, especially near HPOZ areas, and run code-compliant feeders to your main service and ATS.
Will a generator be too noisy for nearby apartments?+
Modern generators with acoustic enclosures, critical-grade mufflers, and strategic placement can meet LAMC noise limits. We add sound barriers when required and schedule routine testing during permitted daytime windows. Gas units are generally quieter than diesel. We model projected sound levels and propose siting that respects neighbors and outdoor patios.
How long does the whole process take in Echo Park?+
On-site installation is typically 2–5 days after equipment arrives. The overall timeline includes design (about a week), LADBS permits (2–4 weeks), and, if applicable, AQMD/LAFD reviews. Lead times for generators and transfer switches can range from 2–6 weeks depending on model. We provide a detailed schedule and keep you updated at every step.