Residential EV Charger Installation in Echo Park
Power up your EV at home with a safe, code-compliant charger tailored to your Echo Park property. From the historic Victorians along Carroll Avenue to hillside bungalows above Echo Park Lake, we design clean, discreet installations that respect architecture while delivering reliable Level 2 charging. Our licensed team handles everything—load calculations, permits with LADBS, panel upgrades, and commissioning—so you can plug in with confidence. Whether your parking is in a detached alley garage or a tight driveway off Sunset Boulevard, Shaffer Construction, Inc. routes power efficiently, protects your system from heat, and future\u2011proofs for a second EV. Get faster charging, lower costs than public stations, and a professional installation that elevates both convenience and home value.
Our Work



Benefits
Future-Proof EV Charging Solutions
We design installations that grow with your needs. From Wi‑Fi/Bluetooth-enabled Level 2 chargers with app scheduling and usage tracking to EV Energy Management Systems (EVEMS) that dynamically balance loads, we build in flexibility. We support hardwired units and NEMA 14‑50 solutions from top brands, integrate load-sharing for two EVs, and configure time‑of‑use settings for LADWP rate plans. Conduit paths and panel space are planned for potential solar or battery integration, keeping your home EV-ready for years.
Permits and Safety Compliance
Shaffer Construction manages your LADBS permit, inspection scheduling, and documentation end-to-end. We follow the California Electrical Code Articles 220 and 625 for load calculations and EVSE, ensure dedicated circuits and correct overcurrent protection, and align with LADBS directives on GFCI/AFCI. When service upgrades are required, we coordinate with LADWP for meter/main changes. In HPOZ areas, we prepare low-visibility routing plans to satisfy preservation guidelines while maintaining full code compliance.
Expert Workmanship Guaranteed
We use THHN/THWN‑2 copper conductors in EMT or Schedule 80 PVC where exposed outdoors, industrial-grade breakers, stainless or galvanized hardware, and NEMA 3R enclosures. Every termination is torqued to manufacturer specs, circuits are clearly labeled, and grounding/bonding are verified at the charger and panel. Our team follows NFPA 70E safety protocols, pressure-tests weather seals, and performs thermal checks during commissioning for long-term reliability.
Custom Charging Solutions
Our site assessment documents panel capacity, parking layout, and architectural details before we propose solutions. We map the shortest, least-visible conduit routes, evaluate trenching or attic pathways, and recommend either hardwire or NEMA 14‑50 based on your charger and usage. For historic facades, we conceal runs in crawlspaces or garage interiors where feasible. You’ll receive a detailed plan with materials, amperage, and timeline before we pull a permit.
What We Offer
Frequently Asked Questions
Do I need a panel upgrade for a Level 2 charger in an older Echo Park home?+
Not always. We perform a load calculation to see if your existing 60–100A panel can support a 40–50A EV circuit. If not, we can either upgrade to a 200A service or install an EV Energy Management System (EVEMS) that automatically limits charging to stay within your service capacity—often avoiding a full upgrade.
How do you handle charger installations in the Angelino Heights HPOZ or other historic areas?+
We plan low‑visibility routes that preserve historic façades—concealing conduit in crawlspaces, attics, or garage interiors. We prepare drawings that address HPOZ guidelines and coordinate any required reviews alongside your LADBS permit, maintaining both aesthetics and code compliance.
My garage is off an alley and 80–120 feet from the panel. Is that a problem?+
Long runs are common in Echo Park. We size conductors to minimize voltage drop, select EMT or Schedule 80 PVC to withstand exposure, and trench where needed with proper depth and marking. If distance pushes load limits, we can add a small subpanel at the garage for future flexibility.
Can I use my existing dryer outlet for EV charging?+
We recommend a dedicated, properly sized circuit to meet code and avoid nuisance trips. In some cases, we can install a smart switch or load-sharing device to safely alternate power between a dryer and EVSE, but it must be permitted and configured to comply with CEC Article 625.
How long does the permit and installation process take in Echo Park?+
Permits through LADBS typically take 2–4 weeks. Once approved, most residential installations are completed in 1–3 days, depending on distance to the parking area, any trenching needs, and whether a panel or meter‑main upgrade is required.
Are there utility incentives or rate plans I should know about?+
LADWP has offered EV-related programs and time‑of‑use (TOU) rates that can reduce charging costs. We’ll guide you on charger features that support TOU scheduling and point you to current LADWP programs so you can capture any available savings.
Related Services in Echo Park
Ready to Get Started?
Contact us today for a free consultation and quote on your electrical project!