Dedicated Equipment Circuits in Silver Lake
From bungalows near the Silver Lake Reservoir loop to contemporary hillside homes above Sunset Junction, dedicated equipment circuits keep your appliances, HVAC, and home technology running safely and reliably. Shaffer Construction, Inc. designs and installs purpose-built circuits that match each device's load, voltage, and protection needs while meeting Los Angeles code. We understand the mix of vintage charm and modern living in Silver Lake. Whether you're adding a mini-split to a Craftsman, powering a home office, or upgrading your kitchen, our licensed electricians ensure the right wire size, breaker type, and grounding—so no more nuisance trips, overheating conductors, or overloaded panels. Expect clean work, clear communication, and results you can count on.
Our Work



Benefits
About This Area
Silver Lake blends old and new: mid-century bungalows on tree-lined streets, Spanish Revival gems with plaster walls, classic Craftsman homes with thick framing, and steeply perched contemporary builds with dramatic views of the hills and the water. Many residences were built from the 1920s through the 1960s, then updated in phases over the decades by artists, young professionals, and families drawn to the creative energy, indie coffee shops, and the calm of the reservoir. These homes often started with minimal electrical service and limited branch circuits. Today’s lifestyle demands more: reliable air conditioning during hot summers, dedicated power for dishwashers and microwaves, smart appliances, home studios, and EV-ready garages. Adding dedicated equipment circuits is one of the most effective ways to modernize safely without gutting walls or overhauling your entire electrical system at once. For hillside properties, careful routing and attention to conduit aesthetics and weather exposure matter just as much as code compliance.
Local Electrical Challenges
In Silver Lake, aging wiring is common—original cloth-insulated or even knob-and-tube in pre-war homes, and occasional aluminum branch circuits from mid-century remodels. Many panels are still 60–100 amps, undersized for today’s combined loads of HVAC, kitchen appliances, and home office gear. Lack of GFCI and AFCI protection shows up frequently in kitchens, laundries, and bedrooms. Hillside construction complicates routing: long runs, tight attics, plaster-and-lath walls, and exterior conduit transitions demand thoughtful design. Heat waves push condensers and mini-splits hard, so properly sized conductors and correctly rated breakers are essential to prevent voltage drop and nuisance trips. We also see legacy multi-wire branch circuits without handle ties and missing equipment grounding—both code violations we correct during dedicated circuit projects.
Permits & Compliance
In Silver Lake, electrical permits are issued by the Los Angeles Department of Building and Safety (LADBS). Most dedicated circuit additions qualify for an Online Electrical Permit, with inspections typically scheduled within a few days of request. Depending on scope and access, the overall permit process usually runs 2–4 weeks from application to final sign-off. Work in hillside communities with HOAs may require pre-approval, especially when exterior conduit or equipment is visible. We coordinate inspection scheduling and adhere to the California Electrical Code (CEC) as adopted by the City of Los Angeles, including LADBS amendments. If panel upgrades or service changes are needed, we also align with LADWP requirements.
What We Offer
Frequently Asked Questions
Do I need a permit to add a dedicated circuit in Silver Lake?+
Yes. In the City of Los Angeles, most new circuits require an LADBS electrical permit. Many single-circuit additions qualify for online permits and a straightforward inspection. We handle the permit, schedule the inspection, and provide documentation so you have a clear record for future resale or insurance.
My panel is only 100 amps—can I still add circuits for a mini-split and microwave?+
Often, yes. We start with a load calculation to see if capacity exists. If the panel is near its limit, we may recommend a high-efficiency breaker configuration, a subpanel, or targeted load management. If a full upgrade is necessary, we’ll coordinate the scope with LADBS and LADWP and present options and timelines.
Will you have to open up walls in my 1920s Spanish Revival home?+
We plan routes to minimize openings—using attics, crawl spaces, closets, or exterior conduit runs where appropriate. When wall access is unavoidable, we make small, strategic cuts, protect finishes, and coordinate patching. Our goal is to deliver a clean, code-compliant circuit with as little disruption as possible.
I’ve heard Los Angeles doesn’t allow Romex. How will you wire my circuit?+
In the City of Los Angeles, residential work typically uses conductors in metallic raceway (such as EMT or flexible metal conduit) rather than NM-B cable. We install THHN/THWN-2 copper conductors in conduit, with properly rated boxes and fittings, in line with LADBS requirements and the California Electrical Code.
What about older aluminum branch wiring—can you still add a dedicated circuit safely?+
Yes. New dedicated circuits are installed with copper conductors sized to the load. Where we must interface with existing aluminum wiring, we use listed connectors (such as AlumiConn) and antioxidant compounds, and we verify termination torque. We also evaluate grounding and recommend upgrades to improve overall system safety.
How long will my power be off during installation?+
For most dedicated circuits, we only de-energize the panel briefly—typically 30–60 minutes—while installing the breaker and making terminations. The rest of the work can often proceed with the main power on. We’ll schedule any brief outage windows at a time that works best for you.
Related Services in Silver Lake
Ready to Get Started?
Contact us today for a free consultation and quote on your electrical project!
Contact Us