Data, Network & AV Wiring in Venice
Your Venice business depends on fast, reliable connectivity—whether you're running a boutique on Abbot Kinney, a caf\u00e9 steps from the Venice Sign at Windward and Pacific, or a creative studio near the canals. Shaffer Construction, Inc. designs and installs commercial-grade data, network, and AV wiring that stands up to coastal conditions and heavy daily use. We build robust, standards-based systems with clean cable management, clear labeling, and certified testing so your Wi\u2011Fi, PoS terminals, displays, and conference rooms simply work. From salt\u2011air\u2011resistant materials to thoughtful pathways in tight vintage spaces, our locally experienced team delivers uptime, performance, and a tidy finish.
Our Work



Benefits
Future-Ready Connectivity Solutions
We engineer Venice installations to scale with your business. That means Cat6a for multi‑gigabit and Wi‑Fi 6/6E backhaul, with fiber‑ready conduit stubs between MDF/IDFs where growth is likely. We design PoE++ (up to 90W) budgets for cameras, APs, touchscreens, and future devices, and deploy HDBaseT or AV‑over‑IP for 4K/8K media distribution. Smart, cloud‑manageable switches and WAPs enable remote monitoring, alerts, and rapid troubleshooting—ideal for multi‑site owners along Lincoln or Rose. Rack elevations, patch‑panel density, and labeling are standardized so adds, moves, and changes are fast and predictable.
Permits and Code Compliance
Shaffer Construction handles permitting end‑to‑end—submittals, plan check responses, and scheduling inspections with LADBS. We build to the California Electrical Code and Los Angeles amendments, referencing NEC Articles 725, 760, 800, and 820 for low‑voltage, communications, and coax. Firestopping is installed per UL‑listed systems. We adhere to ANSI/TIA‑568 for structured cabling, TIA‑569 for pathways, and TIA‑606‑B for labeling. For AV controls and wall interfaces, we factor ADA reach ranges and accessibility. Our goal is a smooth approval, a clean final, and documentation that stands up to future audits.
Reliable Expert Workmanship
Coastal work demands durable materials and meticulous technique. We specify plenum (CMP) or riser (CMR) cable as required, stainless or powder‑coated hardware near the beach, UV‑resistant outdoor-rated cable, and NEMA 4X enclosures for exposed devices. Cable trays and ladder rack are radius‑compliant; Velcro fasteners protect jackets; and every drop is labeled to TIA‑606‑B. We certify copper links with Fluke testers and deliver PDF reports. Drip loops, sealed penetrations, and anti‑corrosion compounds on outdoor terminations extend life and reduce maintenance for boardwalk‑adjacent sites.
Tailored Commercial Wiring Design
Every Venice property is different. We begin with a site survey to map pathways, risers, and RF conditions, then create heatmaps for indoor/outdoor Wi‑Fi coverage (including patios and rooftops). We draft rack elevations, patch panel counts, and port maps tied to your floor plan and device list—PoS, cameras, speakers, displays, and workstations. We model PoE loads, closet ventilation, and UPS runtime. The result: a tailored, scalable design that fits your space, supports future growth, and minimizes visual impact in architecturally sensitive interiors.
What We Offer
Frequently Asked Questions
Do I need a permit for low‑voltage data and AV wiring in Venice?+
Many commercial low‑voltage projects require a permit through the Los Angeles Department of Building and Safety. Interior‑only data/AV work may be plan‑checked and inspected quickly; however, Venice’s Coastal Zone sometimes requires a coastal exemption. We handle submittals, coordinate inspections, and confirm when exemptions apply so your job stays compliant and on schedule.
How do you protect wiring from salt air and moisture near the beach and canals?+
We specify outdoor‑rated cable and NEMA 4X enclosures for exposed devices, use stainless or coated hardware, add drip loops, and seal penetrations. Indoors, we avoid coastal‑corroded connectors and apply anti‑corrosion compounds where appropriate. We also plan for maintenance—accessible junction points, spare drops, and documented labeling reduce long‑term exposure risks and service time.
Can you install after hours to avoid disrupting customers on Abbot Kinney?+
Yes. We routinely schedule night or early‑morning work for retail and restaurants. We phase installations—pulling cable and rough‑in after hours, then terminating and testing during low‑traffic times. Our crews protect finishes, maintain clean sites, and coordinate with managers and security so your operations stay smooth.
What cabling should I choose—Cat6 or Cat6a—for my Venice business?+
Cat6 supports 1–5 Gbps at shorter runs and is cost‑effective for small spaces. Cat6a supports 10 Gbps to 100 meters and is better for Wi‑Fi 6/6E backhaul, high‑density APs, and future growth. In Venice, we often recommend Cat6a for backbones and high‑bandwidth zones, with Cat6 for endpoint drops to balance performance and budget.
Will Coastal Commission review delay my project?+
Most interior‑only low‑voltage projects qualify for a coastal exemption and proceed within normal LADBS timelines (often 2–4 weeks for plan review when required). Exterior devices or facade work may trigger additional review. We screen your scope early, prepare the right paperwork, and coordinate with City Planning to avoid surprises.
Ready to Get Started?
Contact us today for a free consultation and quote on your electrical project!
Contact Us