Pool, Hot Tub & Spa Electrical in Atwater Village
Transform your Atwater Village backyard into a safe, reliable retreat with professional pool, hot tub, and spa electrical by Shaffer Construction, Inc. From GFCI protection and bonding to dedicated circuits and smart controls, we install everything to code and built for long-term performance in LA's inland valley heat. Whether you're near the Hyperion Bridge, strolling the LA River Bike Path, or just steps from Tam O, # Right single quotation mark (apostrophe) r'‘': Shanter and the Atwater Village Farmers Market, we tailor every installation to your home's age, layout, and power needs. Expect clear timelines, neat workmanship, and strong warranties. Call or text (323) 642-8509 or email hello@shaffercon.com to get started.
Our Work



Benefits
Future-Ready Pool Power
We design with the future in mind: variable-speed pumps, automation panels, and spare capacity for add-ons like heat pumps, in-floor cleaners, or landscape lighting. Our systems integrate with Pentair, Hayward, and Jandy smart controls for Wi‑Fi scheduling, remote monitoring, and load management. We right-size feeders and conduits to allow upgrades later and can install subpanels at the equipment pad for organized, scalable power distribution without revisiting trenching.
Strict Code Compliance
Shaffer Construction manages LADBS permitting end-to-end, prepares drawings, and coordinates inspections so your project passes the first time. We build to the California Electrical Code (CEC) with City of Los Angeles amendments, focusing on NEC Article 680 for pools and spas, GFCI/AFCI requirements, and Title 20/24 energy standards for filtration pump controls. Our team documents bonding connections, equipment listings, and clearances, ensuring a smooth rough and final inspection with no surprises.
Proven Expertise That Lasts
We use copper THHN/THWN‑2 conductors, Schedule 40/80 PVC underground and where exposed to impact, and liquidtight flexible conduit at equipment. Disconnects are NEMA 3R/4X with stainless hardware, and all terminations are torqued to spec. We install listed pool/spa transformers and GFCI breakers, seal penetrations, and label equipment clearly. Every system is megger-tested where appropriate and function-tested before handoff, delivering reliability through LA summers and pool-chemical exposure.
Custom Solutions For You
Every project begins with a detailed load calculation and on-site assessment of panel capacity, trench routes, and equipment placement. We coordinate with your pool builder, landscaper, or spa vendor, map utilities with 811 DigAlert, and design clean conduit paths that respect Atwater Village architecture. Plans include bonding grid layouts, dedicated circuits, smart control integration, and lighting zones—customized to your yard, setback constraints, and how you use the space.
What We Offer
Frequently Asked Questions
Do I need a permit for pool, hot tub, or spa electrical work in Atwater Village?+
Yes. LADBS requires permits for new pool/spa electrical and many significant upgrades. We secure the permit, coordinate the bonding grid/trench inspection (if applicable), and meet the inspector for final. Approvals typically take 2–4 weeks depending on scope and plan check. Minor like-for-like equipment swaps may be expedited, but we always verify with LADBS.
My house has an older 100A panel—can I still add a spa?+
Maybe. We perform a load calculation per the California Electrical Code to determine capacity. Many spas require a 40–60A 240V circuit; if your panel lacks capacity or breaker spaces, we may add a subpanel or recommend upgrading to 200A. We’ll propose the most cost-effective, code-compliant path for your specific home.
What’s the difference between GFCI and bonding, and why do I need both?+
GFCI protection quickly interrupts dangerous ground-fault currents to prevent shock, while bonding connects metallic parts and the surrounding deck steel to equalize voltage so no shock potential exists. For pools/spas, both are required by Article 680—GFCI prevents faults from energizing water, and bonding stabilizes voltage around the pool area.
How long will installation take, and what’s the total timeline?+
On-site work usually takes 1–3 days. Including design and LADBS permitting, plan on a 2–4 week pre-construction period. If a bonding grid inspection is needed before deck pour, we schedule that early to keep your overall pool build on track. We coordinate closely with your builder to minimize downtime.
Are variable-speed pool pumps required, and do they really save money?+
California energy rules require variable-speed filtration pumps for most residential pools. They can reduce energy use by 50–70% compared to single-speed models, commonly saving per year on LADWP rates. We program schedules and speeds through your automation to maximize savings without sacrificing water quality.
Ready to Get Started?
Contact us today for a free consultation and quote on your electrical project!