Data, Network & AV Wiring in Echo Park
Get reliable, fast, and beautifully concealed low\u2011voltage wiring for your Echo Park home. Whether you're streaming at the north end of Echo Park Lake, gaming off Sunset Boulevard, or working from a craftsman bungalow near Angelino Heights, we design and install structured cabling that fits historic architecture and modern demands. Shaffer Construction, Inc. delivers turnkey residential data, network, and AV wiring with minimal disruption to original finishes. From Cat6/Cat6a to HDMI distribution and coax, we build tidy, labeled systems that are easy to expand. Expect cleaner Wi\u2011Fi, rock\u2011solid Ethernet, and a home theater that \u201cjust works\u201d—installed by licensed pros who understand Los Angeles permits and Echo Park's unique building stock.
Our Work



Benefits
Future-Ready Home Wiring
We future‑proof Echo Park homes with Cat6a for up to 10 GbE, PoE+/PoE++ for cameras and access points, and conduit pathways that support upgrades later. We design with Wi‑Fi 6E/7 in mind, using heat‑map planning to place APs. For long HDMI runs, we deploy HDBaseT or active HDMI 2.1 cabling for 4K/8K video. Where appropriate, we pull fiber to central hubs for future multi‑gig service, and label to ANSI/TIA‑606 so adds and changes are simple.
Code-Compliant Installations
Shaffer Construction handles LADBS low‑voltage permitting, submittals, and inspection scheduling. We install to California Electrical Code (based on NFPA 70/NEC), NEC Chapter 8 (Articles 800/820/770/725), and follow TIA/EIA‑568 structured cabling, TIA‑607 grounding/bonding, TIA‑606 labeling, and TSB‑184‑A for PoE. All penetrations are sealed with UL‑listed firestopping where required, and we maintain separation from power per code to minimize interference and ensure safety.
Expert Workmanship Guaranteed
We use UL‑listed Cat6/Cat6a (CMR/CMP as needed), high‑quality keystones and patch panels, and properly sized J‑hooks and cable trays to preserve bend radius. Terminations are verified with Fluke DSX testing to document performance. We install ventilated wall‑mount racks, surge protection, and bonding to TIA‑607. Every drop is labeled and documented. The result: clean runs, low crosstalk, and a network closet you’ll be proud to open.
Customized Design Solutions
Our planning begins with a site survey: measuring signal loss through plaster, mapping attic/crawlspace access, and identifying historic features to protect. We design discreet pathways, often using baseboards, closets, and existing chases to minimize patching. You’ll get a marked floor plan, labeling scheme, hardware list, and a phased schedule. For hillside or multi‑story homes, we stage work to reduce disruption and keep rooms operational while we pull and terminate new lines.
What We Offer
Frequently Asked Questions
Do I need a permit for low‑voltage wiring in Echo Park?+
Often, yes. LADBS typically requires a low‑voltage permit for new structured cabling, even though it’s under 50 volts. We handle the Express Permit or online submittal, schedule inspections, and provide test reports. If your home is in or near the Angelino Heights HPOZ and exterior surfaces are affected, we coordinate with the Office of Historic Resources as needed.
Can you wire my Victorian or craftsman without damaging plaster walls?+
Yes. We plan discreet pathways using closets, baseboards, and existing chases, and use flexible drill bits and fish tapes to minimize openings. When we must open a wall, we keep cuts small and repair‑ready, preserving trim, picture rails, and moldings. We also offer surface‑mount raceways that can be painted to blend in when invasive work isn’t appropriate.
Should I choose Cat6 or Cat6a for my home?+
Cat6 is excellent for gigabit and short multi‑gig runs and suits most Echo Park homes. If you want 10 GbE to multiple rooms, plan to run PoE++ to cameras/APs, or anticipate higher bandwidth, Cat6a is better. We often mix: Cat6a to key locations (office, media room, APs) and Cat6 elsewhere to balance cost and performance.
How long will my installation take, and do I need to be home?+
Most projects finish in 1–3 days once permits are ready. We protect floors, isolate work areas, and keep dust low. You don’t need to be home every hour, but we’ll schedule brief check‑ins to confirm outlet locations and equipment placement. Final testing and walkthrough take about 30–60 minutes.
Will wiring improve my Wi‑Fi, or should I just buy a new mesh system?+
Hardwiring backhaul to access points dramatically improves mesh performance, especially through plaster walls common in Echo Park. We place APs based on a heat‑map and run Ethernet to each. This usually outperforms wireless‑only mesh, delivering stronger, more consistent coverage and better speeds to every room.
Ready to Get Started?
Contact us today for a free consultation and quote on your electrical project!
Contact Us