Commercial Complete Electrical Rewiring in Santa Clarita

Your Santa Clarita facility depends on reliable power—whether you're running a retail suite at Westfield Valencia Town Center, a medical office near Henry Mayo Newhall Hospital, a restaurant along Bouquet Canyon Road, or a warehouse in the Valencia Industrial Center. Shaffer Construction, Inc. delivers code-compliant, low-downtime commercial rewiring tailored to the Santa Clarita Valley's business mix and hot-summer climate. From assessment to final inspection, we manage every step, coordinate with Southern California Edison for service work, and phase installations to keep your operations moving. Expect clear timelines, meticulous documentation, and future-ready infrastructure that supports your HVAC, IT loads, lighting controls, and EV-readiness. Call or text (323) 642-8509 to start a no-obligation site walk.

Licensed & Insured
A, B & C10 Contractor
25+ Years
Experience in LA
1000+ Projects
Successfully Completed

Our Work

Tesla Supercharger station with solar canopy installation by Shaffer Construction electrical contractorsCommercial EV charging infrastructure with electrical panels and utility meters installed by licensed electriciansTesla Powerwall battery storage system professionally installed on residential home exterior

Benefits

Future-Ready Electrical Solutions

We future-proof your infrastructure with scalable panelboards, oversized conduits for adds and moves, and smart power monitoring. Our designs support networked lighting control (nLight, Enlighted), centralized emergency lighting inverters, surge protection (Type 1/2 SPD), and submetering to allocate costs across tenants. We deploy THHN/THWN-2 copper in EMT, label to ANSI/NEMA standards, and integrate power quality meters to track harmonics, voltage events, and demand peaks—all ready to tie into your building management system.

Permits and Code Compliance

Shaffer Construction manages permitting, plan check responses, and inspections end-to-end. We design to the California Electrical Code (based on NEC), California Energy Code Title 24 Part 6, CALGreen, and applicable NFPA standards (70, 70E, 110 for standby). Selective coordination and available fault current are verified for panelboards and OCPDs. We coordinate SCE meter spots and shutdown windows, provide load calculations, panel schedules, and one-line diagrams, and deliver stamped drawings when engineering is required.

Workmanship You Can Trust

Our electricians are career pros who torque terminations to manufacturer specs, maintain torque logs, and perform insulation resistance tests and thermal imaging before closeout. We use compression EMT fittings, NEMA 3R enclosures outdoors, color-coded conductors, and dedicated equipment grounds. Junction boxes are sized per fill calculations, and penetrations are sealed with fire/smoke-rated systems. Expect clean bends, straight runs, clear labeling, and a system that’s as reliable as it looks.

Customized Rewiring Plans

Every facility is unique. We begin with a detailed site walk, review as-builts, run a load study, and map out phasing so you can stay operational. Our team coordinates ceiling access, dust control, and off-hours work for retail and medical environments. We produce detailed drawings, panel schedules, and device layouts, then align sequencing with your GC, property manager, and IT provider. The result is a customized plan that fits your operations, budget, and timeline.

What We Offer

Comprehensive load studies and short-circuit/available fault current verification
Panelboard and switchboard upgrades with selective coordination
New copper THHN/THWN-2 branch circuits in EMT and MC in plenums
Feeder replacements and busway additions for warehouses and labs
Dedicated rooftop HVAC circuits, fused disconnects, and GFCI protection
Title 24-compliant lighting rewiring with occupancy/daylight controls
Emergency egress lighting, exit signs, and inverter or generator tie-ins
Isolated grounds and power conditioning for IT/AV and medical equipment
Surge protection (Type 1/2 SPD) at service and distribution levels
Grounding/bonding upgrades, UFER verification, and supplemental electrodes
Temporary power setups and planned SCE shutdown coordination
UL-classified firestopping of penetrations and seismic bracing of equipment
Full labeling, circuit directories, and as-built drawings for closeout
Coordination with property managers/POAs for exterior equipment routing

Frequently Asked Questions

Can my Santa Clarita business stay open during a complete rewiring?+

Often, yes. We develop a phasing plan with off-hours and weekend work, temporary power for critical loads, and a single brief planned shutdown for cutover. Retail and medical suites typically remain operational with careful sequencing and communication.

How long does a commercial rewiring take in Santa Clarita?+

Most small-to-midsize suites finish in 1–3 weeks of on-site work, depending on size, ceiling access, and panel upgrades. Permitting with the City of Santa Clarita Building and Safety Division typically takes 1–3 weeks and can run parallel to preconstruction.

Do I need a permit for panel or circuit replacements?+

Yes. The City of Santa Clarita requires permits for panelboard replacements, new circuits, feeder changes, and service upgrades. We handle plan submittals, inspections, and SCE coordination if service equipment is affected.

Will you bring our lighting into Title 24 compliance?+

Yes. When rewiring lighting, we include required controls—occupancy sensing, multi-level/dimming, daylighting where applicable—and provide acceptance testing documentation so you pass inspections and qualify for utility incentives.

How do you coordinate with Southern California Edison for shutdowns?+

We request meter releases, schedule shutdowns during low-impact hours, and ensure all prep work is complete so power is restored quickly. Our team communicates with your staff to plan around any critical operations.

Ready to Get Started?

Contact us today for a free consultation and quote on your electrical project!

Contact Us