Commercial Complete Electrical Rewiring in Venice
Venice's creative energy runs on reliable power. From Abbot Kinney's boutiques and caf\u00e9s to gallery spaces off Electric Avenue and bustling storefronts along Ocean Front Walk, commercial properties in Venice need wiring that's safe, code-compliant, and built to handle today's loads. Shaffer Construction, Inc. delivers comprehensive commercial rewiring tailored to coastal conditions and busy businesses. We assess existing systems, design modern electrical infrastructure, and phase work to keep doors open and downtime minimal. Whether you operate a restaurant near Windward Circle, a fitness studio by Muscle Beach, or a mixed-use building near the canals, we upgrade wiring, panels, and protection devices to current standards—reliably and on schedule.
Our Work



Benefits
Built for Tomorrow’s Demands
We engineer rewiring that anticipates growth—extra capacity in panels, oversize conduits for future circuits, and networked monitoring for smarter operations. We deploy Square D I-Line or Eaton panelboards, submetering with CTs, and energy monitoring that integrates via BACnet/Modbus. Our designs are EV-charger and solar/storage ready, with provisions for future feeders and spare breakers. From intelligent lighting controls to surge protection with remote diagnostics, your Venice property gains a scalable electrical backbone built for evolving technology.
Permits and Total Compliance
Shaffer Construction manages the entire permitting process with LADBS, coordinates with LAFD when life-safety is impacted, and navigates Venice Coastal Zone considerations as needed. We design and install to the California Electrical Code (based on NFPA 70), Title 24 energy standards, CALGreen, and ADA requirements for device mounting heights and controls where applicable. We provide stamped single-line diagrams, panel schedules, and load calcs, ensuring inspections go smoothly and your system meets every local and state requirement.
The Highest Standard of Workmanship
Coastal work demands premium materials and exacting methods. We favor copper THHN/THWN-2 conductors, EMT or PVC-coated GRC in exposed coastal areas, NEMA 3R/4X enclosures near salt air, and stainless or hot-dipped galvanized hardware. Terminations are torqued to manufacturer specs and verified, bonding is continuous, and labeling is permanent and legible. We perform insulation resistance testing and thermal imaging to validate performance, delivering a resilient system designed to minimize corrosion and maximize uptime.
Tailored, Thorough Planning
Every Venice business is different. We start with a comprehensive assessment, then model loads, create a single-line, and map circuits to your operations. Phasing plans prioritize safety and business continuity—after-hours and weekend work, temporary power, and targeted shutdowns to keep your storefront, kitchen, or studio running. We coordinate with tenants, property managers, and LADWP to minimize disruptions, and we deliver as-builts so future changes are straightforward and code-compliant.
What We Offer
Frequently Asked Questions
How long will a commercial rewiring project take for my Venice storefront?+
Most small to mid-size retail spaces are completed in 5–15 working days after permits, depending on square footage, ceiling access, and the need for service upgrades. We phase work after-hours when possible to keep you open, and we coordinate with LADBS for timely inspections to avoid delays.
Will I need to close my business during the rewiring?+
Not necessarily. We plan phased shutdowns, provide temporary power where feasible, and schedule noisy or disruptive tasks after-hours or on off-days. For critical cutovers, we’ll coordinate brief closures well in advance to protect inventory and ensure life-safety systems remain functional.
Do Coastal Zone rules affect electrical rewiring in Venice?+
Interior rewiring often proceeds with standard LADBS permits, but exterior work—like relocating service equipment or rooftop conduit—may trigger Venice Coastal Zone review, and in some cases California Coastal Commission involvement. We assess your scope upfront and handle any required Coastal coordination to keep the project compliant.
What materials are best for Venice’s salt air environment?+
We specify EMT or PVC-coated rigid steel in exposed areas, NEMA 3R/4X enclosures, stainless or galvanized hardware, and THHN/THWN-2 copper conductors. Indoors, MC cable is common; NM-B (Romex) is used only where code permits. These choices significantly reduce corrosion and extend system life near the ocean.
Ready to Get Started?
Contact us today for a free consultation and quote on your electrical project!
Contact Us