Commercial Electrical Code Compliance & Corrections in Venice

Keeping a Venice storefront, gallery, or restaurant compliant isn't just a box to check—it protects your staff, guests, and investment while preventing costly shutdowns. Shaffer Construction, Inc. delivers fast, precise Electrical Code Compliance & Corrections tailored to the unique conditions along Abbot Kinney Boulevard, Ocean Front Walk, and the Venice Canals. From salt-air corrosion to aging panels in older mixed-use buildings, we diagnose violations, engineer clear fixes, and manage inspections with the Los Angeles Department of Building and Safety. Our commercial-first approach minimizes downtime, coordinates with landlords and property managers, and documents every correction so your business passes with confidence the first time.

Licensed & Insured
A, B & C10 Contractor
25+ Years
Experience in LA
1000+ Projects
Successfully Completed

Our Work

Tesla Supercharger station with solar canopy installation by Shaffer Construction electrical contractorsCommercial EV charging infrastructure with electrical panels and utility meters installed by licensed electriciansTesla Powerwall battery storage system professionally installed on residential home exterior

Benefits

Modern Standards, Lasting Safety

We design code corrections that also prepare your Venice business for what’s next. From networked lighting controls meeting Title 24 to power monitoring and smart panels, we implement scalable solutions that adapt as you expand. We deploy surge protection, marine-grade hardware where needed, and cloud-connected control platforms for scheduling and demand response. Our documentation includes updated one-lines, panel schedules, and labeling so future improvements are straightforward and fully traceable.

Comprehensive Permitting & Compliance

Shaffer Construction, Inc. manages the entire permitting path with LADBS, using ePlanLA when plan check is necessary. We correct to the 2022 California Electrical Code (with Los Angeles amendments), Title 24 Part 6 lighting controls, and the LA Green Building Code. Our team coordinates with LADWP for meter and service work, prepares inspection packets, and leads the inspector walk-through. You receive clear as-builts and a close-out package to satisfy lease, insurance, and AHJ requirements.

Experienced, Licensed Electricians

We use commercial-grade, code-compliant materials: copper THHN/THWN-2 conductors, compression fittings in damp locations, NEMA 3R/4X enclosures near the coast, WR receptacles, and stainless or hot-dip galvanized hardware. All terminations are torqued to manufacturer specifications with documented logs. Where aluminum lugs are present, we apply antioxidant compound and verify proper compatibility. We perform load-balancing and thermal scans to confirm reliability and reduce nuisance trips.

Thorough Inspection & Customized Planning

Every Venice property is different. We begin with a detailed site walk, violation inventory, and photo documentation. Then we develop a correction plan with load calculations, updated one-line diagrams, and a step-by-step sequence to minimize downtime for retail hours and kitchen operations. We coordinate with landlords, property managers, and neighboring tenants for access. Your plan includes a clear timeline, materials list, and inspection strategy so there are no surprises.

What We Offer

GFCI/AFCI installation and verification for kitchens, bathrooms, rooftops, and exterior receptacles
Grounding and bonding upgrades, including water/gas bonding and supplemental electrodes
Panelboard corrections: labeling, clearances, torque verification, and bus/breaker replacements
Undersized or overcrowded panel remediation and service equipment upgrades with LADWP coordination
Wet-location wiring fixes: WR receptacles, in-use covers, compression fittings, and NEMA 3R/4X enclosures
Corrosion mitigation: stainless hardware, anti-oxidant compound, dielectric protection, and sealing
Title 24 lighting control corrections: occupancy sensors, time-switching, daylighting, and multi-level control
Emergency egress lighting and exit sign repairs, battery testing, and circuit separation
Kitchen and restaurant dedicated circuits, disconnects, and hood/ANSUL interlock power compliance
Rooftop equipment corrections: proper disconnecting means, weatherproofing, and conduit support
Circuit mapping and one-line updates with as-built documentation and panel schedules
Surge protective device installation and transient over-voltage protection for sensitive electronics
ADA reach range coordination for device locations and signage power
Transformer, UPS, and server room power compliance, ventilation and clearance checks

Frequently Asked Questions

Do Venice businesses need a permit for minor electrical corrections?+

It depends on scope. Simple like-for-like device swaps may not require plan check, but many corrections—adding GFCI/AFCI protection, panel repairs, circuit additions, or Title 24 control updates—need an LADBS permit. We review your violation list, confirm permit requirements with LADBS, and, if needed, submit via ePlanLA and coordinate inspections to avoid delays.

How do you minimize downtime for a retail shop on Abbot Kinney Boulevard?+

We phase work around business hours, perform panel and circuit corrections during off-hours, and pre-assemble materials to shorten on-site time. Critical loads are identified and protected; we set up temporary power when feasible, and we complete testing before doors open. The plan includes clear milestones so staff and neighbors know what to expect.

Will Coastal Commission review affect my electrical correction timeline in Venice?+

Most interior corrections proceed with LADBS only. Coastal Commission review may be triggered when exterior equipment changes are proposed—such as relocating a service, adding rooftop equipment, or installing outdoor gear in the Coastal Zone. If applicable, we advise early, integrate the review into the schedule, and prioritize interior items so progress continues.

What corrosion-resistant measures do you use near the Venice Canals and Ocean Front Walk?+

We specify NEMA 3R/4X enclosures, WR receptacles with in-use covers, stainless or hot-dip galvanized fasteners, compression fittings in damp locations, and approved sealants. Conductors are copper THHN/THWN-2, terminations are torqued to spec with logs, and aluminum connections receive antioxidant compound. We also recommend periodic inspections and thermal scans to catch early signs of degradation.

Ready to Get Started?

Contact us today for a free consultation and quote on your electrical project!

Contact Us